Monday, August 31, 2009

BATHROOM UPDATE PICS


I AM SO EXCITED THE PROJECT IS ALMOST DONE. ALL THAT IS LEFT IS THE PUTTING IN THE SINK, THE TILES FOR THE SHOWER, THE NEW FLOOR OVER THE CONCRETE FLOOR AND THE PAINTING IN THE BATHROOM,HALLWAY AND BEDROOM. I CANNOT WAIT UNTIL THE BATHROOM IS FINISHED TO START USING IT.


BRAND NEW SET OF BI FOLD DOORS IN BEDROOM FOR THE CLOSET
BRAND NEW BI FOLD DOOR FOR THE LINEN CLOSET
AWESOME NEW LINEN CLOSET TO REPLACE THE ONE I LOST ALONG WITH HANDICAP GRAB BAR ON OUTSIDE OF SHOWER
NEW HIDDEN STORAGE COMPARTMENT INSIDE THE NEW LINEN CLOSET IN THE BATHROOM
NEW TRIM ON OUTSIDE OF BATHROOM DOOR IN THE HALLWAY
NEW TRIM IN HALLWAY

NEW TRIM AROUND BATHROOM DOOR ON INSIDE
NEW FLOOR TRIM IN THE BATHROOM
MORE TRIM THAT GOES AROUND TO THE SHOWER EDGE
BEAUTIFUL BRAND NEW CLOSET SHELF AND POLE INSIDE MARIA'S OLD BEDROOM THAT WILL NOW BE THE GUEST ROOM

No comments: